Platform modernisation
Moving off the thing that is holding you back, without a freeze.
The problem
What usually brings people here.
The system works and nobody wants to touch it. Releases are quarterly because that is how long the regression takes, the one person who understands the billing logic is a flight risk, and a rewrite has been proposed twice and refused twice, correctly.
What we do
How the work actually runs.
No freeze and no big bang. We instrument first so there is a baseline, carve the system along a seam that holds, and move one slice at a time with a rollback at every step. The old path keeps running until the new one has carried production traffic. You get a sequencing plan before anything moves.
How this runs
Design, develop, refine.
Design
Two to four weeks. We scope with the engineers who will build it, so the estimate comes from the people held to it.
Develop
Two-week increments, demoed to you, shipped behind flags. You see working software in week three, not a status deck.
Refine
The squad stays. Lead time comes down, the backlog gets shorter, and the same people know why every decision was made.
Proof lives on the work page.
We publish numbers per engagement, cleared by that client, rather than per service line. What is written up there is what we are allowed to show.
Also in Product Engineering
Related services.
Start a conversation
Tell us what you are trying to ship.
You will get a reply from an engineer, not a form handler. If we are not the right firm for it, we will say so and tell you who is.